VILLURA

Every turn on one board.

Everyone from the tech to the regional sees the same board. No group text, no guessing which unit is stuck or on what.

Start free

Free during the pilot. No card required.

TRASH-OUT

23B

Maple Court

4d in stage

On track

MAINTENANCE

7C

Rowan Place

9d in stage

2 days late

18A

Maple Court

3d in stage

On track

PAINT

12A

Rowan Place

6d in stage

On track

FLOORS

31D

Birch Row

2d in stage

On track

CLEAN

PUNCH

5B

Birch Row

1d in stage

On track

Most turn days are lost between stages, not during them.

A board recovers 1–3 days a turn, and about $1,700 a year in your own time and second supply runs.

WHAT IT DOES

Move a unit from the hallway

No laptop. Open it on your phone, tap the unit, move it to the next stage.

Tap, not drag.Every stage fits on one screen, and every card has a move menu.

Costs, logged as they land

Add a line item the moment the invoice arrives. Every turn keeps a running total.

Trash-outHauling, 2 loads$420.00
MaintenanceDisposal, faucet$1,185.50
PaintLabor, materials$960.00
Running total$2,565.50

A list for the Pro desk

Export the materials for a turn. One page, black ink, folds into a back pocket.


Shopping list · Unit 23B

  • 2 gal eggshell, Swiss Coffee
  • 1 box 2 in drywall screws
  • 4 furnace filter 16x25x1
  • 1 toilet flapper kit

A report owners read

One page per turn: what was done, what it cost, how long the unit sat.


Turn summary · Unit 23B

Trash-out$420.00
Maintenance$1,185.50
Paint$960.00
Floors$2,240.00
Total · 15 days vacant$5,230.50
No testimonials yet.

Villura is new. We are looking for three property managers who will run real turns through it and tell us plainly where it falls short. If that is you, the next section is for you.

Free during the pilot, then $99 to $199 a month.

Priced by portfolio size, not per door. Unlimited units and turns. Cancel any time.